Case Study

Norrington Substation, Melksham

Blara Group required a comprehensive understanding of the Norrington Substation site, particularly the condition and construction of its concrete base. Traditional intrusive methods would have risked damaging the structure, so a non-destructive approach was essential.

  • Works reduced complexity, saved time, and provided assurance on the structural integrity of the substation base.
  • Completed without compromising the concrete’s integrity.
  • Comprehensive package of surveys worth in excess of £80,000.

What they said

Infrastruct North delivered a surveys across our substation portfolio, including topographic surveys using 3D laser scanning, utilities mapping, GI, acoustic surveys, and NDT.

The quality of their reporting and professionalism on site gave us full confidence in their capabilities, and we look forward to working with them again.

Walter Martin, Managing Director Blara Safety UK