Case Study

Safe Walkway Installation at Clapham Depot

Infrastruct North successfully delivered a 200-metre safe walkway installation at Clapham Depot, significantly improving pedestrian safety and access around the operational buildings.

  • 200 metres of safe walkway installed.
  • Dura Grating Waffle Board system used.
  • Installed during a single weekend shutdown to minimise disruption.
  • Completed by four engineers on site.

Related services

  • Civils installation