Case Study
Sandhurst Military Estate — Bridge 16 & Culvert 1
Infrastruct North delivered two complementary work packages for Clegg Associates at the Sandhurst Military Estate — an ultrasonic corrosion assessment of Bridge 16’s steel sheet piles, and topographic and utility mapping surveys to support estate-wide drainage improvements.
- A reliable baseline of remaining steel thickness at Bridge 16, identifying localised corrosion while confirming the majority of the structure remained in serviceable condition.
- Existing drainage runs, chambers and buried utilities traced and surveyed at Culvert 1, giving the designer an accurate model of the estate’s drainage network.
- Multiple survey disciplines delivered in a single coordinated commission — reducing mobilisation costs and referencing everything to one survey framework.