Infrastruct North was commissioned to deliver a detailed topographic and underground utility mapping survey at the 132kV substation serving Andover Commercial Park — supporting a major upgrade of the electrical assets within a live, operational compound.
- Above-ground and below-ground infrastructure captured in one coordinated dataset — reducing the risk of clashes, service strikes and unplanned changes during the upgrade.
- Surveyed safely within a live 132kV environment, using non-conductive equipment and strict safe working distances.
- Fully registered 3D point cloud delivered in Autodesk RCS format — ready for AutoCAD, Revit, Civil 3D and Navisworks.